Engineering & Delivery
Control stage 06 of 06

Order Delivery

Coordinate protection, package identification, documentation and delivery sequence for the destination and buyer-side handoff.

Buyer decision protectedProject materials arrive with clearer identification, protection and receiving information.
Metal mesh prepared for a documented packing and delivery handoff
Packing and handoff reference

Shown as process or project context. Acceptance and supply scope follow the approved order references.

Your sample, from purpose to receipt

Know what is coming.
Know what to review.

A clear sample purpose, visible packing record and shipment reference help your team receive and assess the right items.

01

Confirm the sample purpose

Agree whether the sample is for pre-production, quality review, a sealed reference, testing, promotion or production. Make the decision and approval scope clear.

A quality-review sample becomes a bulk-production reference only when approved for that purpose.
02

Pack for the item

Match protection to the size and fragility of the sample. Identify small pieces clearly, protect documents separately and add edge or board protection where needed.

Confirm special handling before dispatch.
03

See what was sent

Sample photos and a packing list help you check what is arriving. A sample invoice or customs description is prepared where applicable.

Compare the received items with the dispatch record.
04

Track the shipment

After courier collection, the tracking number is shared and the dispatch record is retained. Review the sample against the purpose agreed at the start.

An approved sealed reference connects the sample review to production and final comparison.
Actual order records

Check before the handoff

These photographs show the kind of visible check and packing evidence that can accompany an order-specific delivery record.

Metal mesh dimensions being checked and photographed before packing
Pre-dispatch checkA photographed dimensional check keeps the inspected item connected to the order record before packing.
Flat order package protected with wrapping and an upright orientation label before loading
Protected packageWrap, flat support and visible orientation marking can be reviewed before the package moves to loading.

For an approved sealed reference, the customer and JBL Metal each retain one sample. Production follows that reference together with the approved order drawings and specifications.

Review the sample approval process
Procurement decision view

Five questions that close this stage

Use these questions to prepare the review, compare scope and identify what is still unresolved before the next release.

01Purpose

Why must this stage happen?

A technically correct product can still create site problems when packages are poorly protected, unidentified or sequenced without the receiving plan. Delivery control connects packing to the buyer-side handoff.

02Buyer input

What should the buyer provide?

  • Destination and receiving conditions
  • Package, label and document requirements
  • Installation or unloading sequence
  • Special protection or handling needs
03JBL Metal review

What does JBL Metal check?

  • Protection appropriate to the product form
  • Package identification and order connection
  • Accessory and document inclusion
  • Handoff information for the receiving team
04Risk if omitted

What can happen if it is skipped?

  • Rigid panels are not supported or edges are exposed
  • Packages cannot be matched to elevations or installation zones
  • Accessories and documents are separated from the related material
05Controlled output

What moves forward next?

  • Protected and identified packages
  • Packing and delivery records
  • Clear handoff information for receiving teams
Evidence for the next decision

What can document this stage

  • Packing and label photographs
  • Package list or identification record
  • Delivery documents connected to the order
Order-specific control

What stays connected to the record

  • Rigid panels receive flat support and edge protection
  • Flexible drapery and accessories follow the approved packing and identification plan
  • Labels and documents connect packages to the order before handoff
Mesh and protective materials shown during packing preparation
Protection during packing
Flat order package protected with wrapping and an upright orientation label before loading
Wrapped package with orientation label

Process references from sample and order reviews. Acceptance points follow the approved project documents.

Buyer FAQ

Questions to resolve at stage 06

What should the buyer provide about receiving?

Share destination, unloading constraints, storage conditions, package limits, required labels and any installation sequence.

Why are labels important?

They help the receiving team connect each package to the order, drawing, area or installation sequence.

Where is delivery timing confirmed?

Timing and delivery responsibilities are confirmed in the project quotation and order documents.

WhatsAppDiscuss a project
Order Delivery for Architectural Mesh Projects