Design intent, size & direction
Share the intended application, concept dimensions, pattern direction and the decision the sample must answer.
JA-A003 is a Art Mesh Weave direction for project review. Compare its visible structure with the application, panel format, support, finish and edge conditions before selecting it.

Dense and decorative woven surfaces selected through colour, texture, backing, lighting and physical sample approval. The model image establishes a starting direction; final configuration and project fit follow the drawings, sample and installation review.
Review the physical texture, colour, lighting, backing and edge treatment together. A representative sample should define the visible approval scope.
Review the primary interior application route →Final application, dimensions, material, finish, edges and installation details are confirmed against the current project requirements.
For JA-A003, review texture, colour, form and the approval boundary of the design concept. Start with the intended application and current drawing or sketch.
Share the intended application, concept dimensions, pattern direction and the decision the sample must answer.
Identify any forming, backing or support concept and access for mounting or handling.
Show seams, returns, interfaces and edges that are visible or accessible to touch.
Provide finish and texture references, surrounding materials and intended lighting.
Open project details Confirm during project review.

Application context reference — not attributed to this model.
Review the application context
Define what the JA-A003 sample should confirm. Agreed sample characteristics are measured and recorded.
For an approved sealed reference, the customer and JBL Metal each retain one sample. Production follows that reference together with the approved order drawings and specifications.
After style approval, production is controlled against the approved sample and order drawings/specifications. Keep the JA-A003 reference connected to each agreed check.
Keep the model, current drawing revision, accepted sample and agreed inspection points linked to the order.
Our current cadence for active orders is a Thursday Order Status, bringing together progress, open points and the next action. Timing follows the agreed order communication plan.
Final fixing, acceptance criteria, responsibilities and delivery conditions follow the approved project and order documents.
Confirm the application, dimensions, orientation, support, edge condition, material and finish direction, installation interface and the decision the sample must prove.
Send a drawing or sketch, application, approximate dimensions, supporting construction, finish direction, quantity, destination and the next decision your team needs.
A sample supports review of visible structure, scale, openness, colour, reflection, edge workmanship and handling. Its approval scope should be recorded.
Keep the approved JA-A003 reference traceable through inspection, protection, packing and receiving review.


Link JA-A003, the drawing revision and sample comparison to the agreed inspection record.
Review protection for visible texture, formed details and separately identified parts.
Keep packing photos, item identification and the packing list linked to the same release record.
Review destination, receiving requirements and agreed delivery documents. For courier samples, tracking is shared after collection.
Share the intended application, drawing or basic dimensions for a project-specific review. JBL Metal will clarify missing information and whether the next step should be drawing review, sample discussion or quotation preparation.