Quality in architectural metal mesh is not a promise โ it is a verifiable record. Every order that leaves JBL Metal is backed by third-party SGS certification, a six-stage production inspection process, full raw material traceability, and a pre-shipment video that you review and approve before the goods are dispatched. You see the goods before we ship them. That is not standard in this industry. It is our standard.
SGS Salt Spray Test certification independently verifies that our stainless steel mesh surface treatments meet defined corrosion resistance standards. Not self-declared โ independently tested.
SGS CertifiedSix inspection hold points from raw material receipt to pre-dispatch. Every deviation from the confirmed specification is documented and resolved before production proceeds to the next stage.
6 QC Hold PointsA complete pre-shipment inspection video is sent to you before goods are released. You see the actual finished goods, packing condition, and labelling โ and confirm in writing before dispatch.
Video ConfirmationThe SGS Salt Spray Test gives you an independently verified baseline for the corrosion resistance of JBL Metal stainless steel mesh systems. For architects, engineers, and procurement teams specifying exterior or coastal architectural mesh, this certification provides documentation that stands behind the specification โ not just the supplier's word.
View Full Certification Details โSGS is the world's leading inspection, verification, testing, and certification company โ headquartered in Geneva, with 2,600 offices and laboratories across 140 countries. SGS certification means the test was performed and the result was verified by an organisation with no financial interest in the outcome. The independence is the value.
Salt spray testing exposes metal samples to a continuous 5% sodium chloride (NaCl) solution mist at 35ยฐC โ simulating the chloride ion exposure experienced in coastal and industrial environments, in a fraction of real time. The test measures when corrosion first appears and how it progresses. Results are reported in hours of exposure without corrosion onset, providing a quantitative, comparable performance metric.
JBL Metal's SGS certification provides a test report number, test conditions, and results that can be referenced in project specifications and procurement documentation. For coastal facade projects, exterior architectural installations, and applications where corrosion resistance must be specified and verified โ not just claimed โ our SGS certification provides the documentation you need to proceed with confidence.
This table shows how key parameters from your confirmed drawing specification compare to actual production measurement results. Every order is verified at three stages: sample confirmation, first-piece inspection, and pre-dispatch check. The table below represents the verification structure applied to every project โ with actual values recorded against each parameter at each stage.
| Parameter | Drawing Specification | Production Measurement | Tolerance Band | Status |
|---|---|---|---|---|
| Wire Diameter | As specified from drawing e.g. 1.5 mm nominal |
Measured on production sample Verified with calibrated gauge |
ยฑ0.05 mm per wire |
โ |
| Aperture / Pitch | As specified from drawing e.g. 10 mm ร 10 mm |
Measured on production sample Repeat measurement across panel |
ยฑ0.5 mm per pitch |
โ |
| Panel Width | Drawing dimension confirmed e.g. 1,200 mm finished |
Measured on finished panel Tape measure + digital calliper |
ยฑ3 mm finished size |
โ |
| Panel Length | Drawing dimension confirmed e.g. 2,400 mm finished |
Measured on finished panel Measured against production template |
ยฑ5 mm finished size |
โ |
| Material Grade | Specified from drawing e.g. SS316 |
Mill certificate verified Batch number cross-referenced |
Exact match required |
โ |
| Edge Treatment | Specified from drawing e.g. Welded edge, 4-side |
Visual + tactile inspection Close-up photo recorded |
Per approved sample |
โ |
| Surface Finish | Specified from drawing e.g. Mill finish / Brushed / PVD |
Visual comparison to approved sample Photo in pre-shipment video |
Per approved sample |
โ |
| Quantity | Confirmed order quantity e.g. 48 panels |
Physical count before packing Count confirmed in packing list |
Exact count required |
โ |
Quality control is most effective when deviations are caught early โ before they propagate through a production batch. JBL Metal's six inspection hold points are designed to catch and resolve issues at the point they occur, not at the point of delivery. Each hold point is documented. No stage proceeds without the previous stage being cleared.
Wire coils and material stock are inspected on arrival against the mill certificate data. Diameter, surface condition, and material certification are verified before the material is accepted into production inventory. Non-conforming material is quarantined and rejected โ not used.
During weaving production, regular patrol inspections monitor tension consistency, aperture uniformity, and surface quality. Variations in weaving tension produce aperture inconsistency that cannot be corrected post-production. Detection at this stage allows immediate adjustment before the deviation extends across the panel batch.
The production sample is measured against the confirmed drawing specification across all critical parameters. Any deviation is documented and referred back to the client for review before production proceeds. The client's written approval of the sample is the production authorisation. No batch production begins without sample sign-off.
The first unit produced from the batch run is measured against the approved sample. This confirms that production tooling, machine settings, and material consistency produce components that match the approval. Deviations at this stage indicate a process setting issue that โ if uncorrected โ would affect the entire batch. The first-piece check is mandatory before batch production continues.
Before packing, a defined sample from the finished batch is re-measured against the specification. All panels are visually inspected for surface condition. Quantity is physically counted against the packing list. Labelling and marking are verified. The pre-dispatch inspection report is completed and filed before goods proceed to the packing and video confirmation stage.
A complete inspection video of the finished, packed goods is recorded and sent to the client before the shipment is released for dispatch. The video covers unpacked goods inspection, surface and edge detail close-ups, quantity verification, packing method, and carton labelling. The client reviews the video and provides written confirmation. Shipment is held until written client approval is received. This stage gives you direct visibility of the physical goods before they leave the factory.
Most suppliers send goods and hope for the best. JBL Metal sends you a video of the goods before they leave the factory. You review it. You confirm. Then we ship. This single process step eliminates the most common source of project site disputes โ goods that do not match expectations arriving after a 3-week sea freight journey.
Incomplete or incorrect export documentation causes customs delays that directly affect your installation schedule. JBL Metal reviews all documentation internally before release โ not after the goods have been collected by the freight forwarder.
A mill certificate gives you complete traceability from the finished mesh panel back to the specific wire batch used in its production. For structural facade applications, export to markets with strict material compliance requirements, and OEM equipment projects where material documentation is part of the CE or equipment certification process โ the mill certificate provides the verification chain your procurement and engineering teams need.
The SGS Salt Spray Test independently verifies that JBL Metal stainless steel mesh surface treatments meet defined corrosion resistance thresholds under salt spray exposure. The test exposes metal samples to a continuous 5% sodium chloride mist at 35ยฐC โ simulating coastal and chloride-rich environments in accelerated time. SGS is the world's largest inspection and certification body, operating in 140 countries. The certification is a third-party result, not a self-declaration. It can be referenced in project specifications and procurement documentation for coastal, exterior, and high-humidity architectural applications.
JBL Metal follows a six-stage production quality inspection process: (1) Raw material incoming inspection โ wire diameter and mill certificate verification; (2) Weaving process patrol โ tension and aperture uniformity monitoring; (3) Sample confirmation inspection โ physical sample measured against drawing spec, client written approval required; (4) First-piece production inspection โ first batch unit verified against approved sample before batch proceeds; (5) Pre-dispatch full inspection โ dimensional re-measurement, 100% visual inspection, quantity count; (6) Pre-shipment video confirmation โ complete inspection video sent to client, shipment held until written approval received. Each stage is documented. No stage proceeds without the previous stage being cleared.
Yes. JBL Metal provides complete raw material mill certificates on request for all orders. The mill certificate documents the chemical composition (Cr, Ni, Mo, C, Mn), mechanical properties (tensile strength, yield, elongation), heat/batch number, and wire diameter of the stainless steel used in your production run. This provides full traceability from the finished mesh panel back to the source material batch โ relevant for structural applications, export compliance, and OEM equipment certification documentation. Advise at order confirmation that a mill certificate is required.
Before every shipment is dispatched, a complete inspection video is recorded and sent to the client via WhatsApp or email. The video covers: unpacked finished goods showing surface condition and dimensional compliance, edge treatment close-up review, quantity count on camera, packing method demonstration, and carton labelling confirmation. You review the video and send written confirmation before goods are released. If you identify any concern, the shipment is held and the issue is resolved first. This process gives you direct visibility of the physical goods before they leave the factory โ eliminating the most common source of site delivery disputes.
Yes. JBL Metal fully supports third-party pre-shipment inspection. If your project requires an independent inspection report from SGS, Bureau Veritas, Intertek, or another accredited inspection body, this is arranged on request. Please advise at order confirmation so the inspection can be coordinated against the production schedule. JBL Metal does not charge a coordination fee โ the inspection fee is charged by the inspection body directly. For projects where third-party inspection is a procurement requirement, advise at drawing submission stage so it can be factored into the project timeline.
Standard documentation with every shipment: commercial invoice, packing list, bill of lading or air waybill, and certificate of origin. Available on request or as required: raw material mill certificate (provided as standard on request), SGS or third-party inspection report, internal QC inspection report, Form E for ASEAN preferential tariff destinations, and material safety data sheet. All documentation is reviewed internally before release โ incomplete or incorrect documentation that could cause customs delays is identified and corrected before the shipment departs.
Drawing-to-production compliance is verified at three stages. First, at sample confirmation: the physical sample is measured against the drawing specification across all critical parameters โ wire diameter, aperture/pitch, panel dimensions, edge treatment, and surface finish. Any deviation is documented and resolved before the sample is approved. Second, at first-piece production inspection: the first unit from the batch is re-measured against the approved sample. Third, at pre-dispatch full inspection: a defined sample from the batch is re-measured, and the pre-shipment video provides a visual record for client review. The approved drawing, approved sample, and inspection records are kept on file for every order.
If a delivered product does not match the confirmed specification, JBL Metal investigates against the production inspection records, approved sample photographs, and pre-shipment video โ which together document the condition of the goods before dispatch. If the non-conformance is attributable to JBL Metal's production, remediation is arranged โ which may include replacement production, dimensional adjustment, or agreed compensation depending on the nature and extent of the deviation. All non-conformance cases are documented and used to improve our production process. Our pre-shipment video confirmation process is specifically designed to prevent this situation by giving clients visibility of the goods before dispatch โ ensuring any concern is raised and resolved at the factory, not at the project site.
Every quality measure described on this page is applied as standard to your project โ from the first drawing review to the pre-shipment video you confirm before dispatch. Start with your drawings and we will walk you through the process.