No standard specifications. Every geometry, material, and surface is defined from the project brief, artist intent, and structural requirement. Starting point is always the drawing or brief.
All specifications for this system are defined from the project drawing or brief. A drawing review is conducted before any quote is issued. Specification conflicts are flagged in writing — not resolved by assumption.
Application environments drive specification decisions. Each context has different structural requirements, finish requirements, and installation constraints.
These ranges represent the achievable specification envelope for this system. Project specifications are defined from drawings — not selected from these tables.
| Parameter | Light / Fine | Standard | Heavy / Large |
|---|---|---|---|
| Parameter | Bespoke Commission | Architectural Feature | Art Installation |
| Starting Point | Artist brief | Architectural drawing | Design intent doc |
| Material | Project-defined | Project-defined | Project-defined |
| Sampling | Mandatory | Mandatory | Mandatory |
| Structural review | Required | Required | Case by case |
Material grade, wire composition, and surface finish are determined by the operating environment, installation exposure, and design life requirement of the project.
Physical samples and QA records are produced for every project. The sample is the binding production reference — not the drawing.
Submit your project drawings or brief. We conduct a full drawing review and respond with a written system recommendation, specification parameters, and execution plan — within one working day.